Diagram Desk

Agile vs waterfall comparison table

Agile and waterfall by planning, handling change, documentation and the projects they suit; useful for software engineering coursework.

The diagram

WaterfallAgilePlanningAll up frontEvery short cycleChangeHardEasyDocumentationHeavyAs neededBest forFixed requirementsChanging needs
Comparison table · 6 shapes

Reading it step by step

  • Planning: Waterfall All up front; Agile Every short cycle
  • Change: Waterfall Hard; Agile Easy
  • Documentation: Waterfall Heavy; Agile As needed
  • Best for: Waterfall Fixed requirements; Agile Changing needs

Shape by shape

ShapeSymbolConnections
WaterfallOption← Planning: All up front, Change: Hard, Documentation: Heavy, Best for: Fixed requirements
AgileOption← Planning: Every short cycle, Change: Easy, Documentation: As needed, Best for: Changing needs
PlanningCriterion→ Waterfall: All up front, Agile: Every short cycle
ChangeCriterion→ Waterfall: Hard, Agile: Easy
DocumentationCriterion→ Waterfall: Heavy, Agile: As needed
Best forCriterion→ Waterfall: Fixed requirements, Agile: Changing needs

Symbols used here

SymbolMeaning
OptionThe column headings.
CriterionThe row headings.

All comparison table symbols and how to draw

Diagram text

Paste this text into the editor to get the same picture, then change the names to fit your own work.

# Agile vs waterfall comparison table
compare
| - | Waterfall | Agile |
|---|---|---|
| Planning | All up front | Every short cycle |
| Change | Hard | Easy |
| Documentation | Heavy | As needed |
| Best for | Fixed requirements | Changing needs |

More comparison table examples

All SeewolLabs tools