Attendance check flowchart
Goes down the class list marking present, late or absent. A loop over a list with a three-way branch.
The diagram
Reading it step by step
- 1. Start at 'Start'.
- 2. 'Load class list' reads or writes the data store. Next: 'Students left to check?'.
- 3. Decide 'Students left to check?': if 'no', go to 'Save and print register'; if 'yes', go to 'Arrived before start?'.
- 4. 'Save and print register' produces a document. Next: 'End'.
- 5. End at 'End'.
- 6. Decide 'Arrived before start?': if 'yes', go to 'Mark present'; if 'no', go to 'Within 10 minutes?'.
- 7. 'Mark present' is a processing step. Next: 'Next student'.
- 8. 'Next student' is a processing step. Next: 'Students left to check?'.
- 9. Decide 'Within 10 minutes?': if 'yes', go to 'Mark late'; if 'no', go to 'Mark absent'.
- 10. 'Mark late' is a processing step. Next: 'Next student'.
- 11. 'Mark absent' is a processing step. Next: 'Next student'.
Shape by shape
| Shape | Symbol | Connections |
|---|---|---|
| Start | Terminator | → Load class list |
| Load class list | Stored data | → Students left to check? · ← Start |
| Students left to check? | Decision | → Save and print register(no), Arrived before start?(yes) · ← Load class list, Next student |
| Save and print register | Document | → End · ← Students left to check? |
| End | Terminator | ← Save and print register |
| Arrived before start? | Decision | → Mark present(yes), Within 10 minutes?(no) · ← Students left to check? |
| Mark present | Process | → Next student · ← Arrived before start? |
| Within 10 minutes? | Decision | → Mark late(yes), Mark absent(no) · ← Arrived before start? |
| Mark late | Process | → Next student · ← Within 10 minutes? |
| Mark absent | Process | → Next student · ← Within 10 minutes? |
| Next student | Process | → Students left to check? · ← Mark present, Mark late, Mark absent |
Symbols used here
| Symbol | Meaning |
|---|---|
| Terminator | Where the flow starts or ends; a rounded rectangle. |
| Process | One action such as a calculation; a rectangle. |
| Decision | A question whose answer picks the next path; a diamond. |
| Stored data | Reads or writes a database or file; a cylinder. |
| Document | A printed document or report; a box with a wavy bottom. |
| Flow line | The order of steps, in the arrow direction. |
Diagram text
Paste this text into the editor to get the same picture, then change the names to fit your own work.
# Attendance check flowchart
flowchart TD
s(["Start"])
a[("Load class list")]
b{"Students left to check?"}
g>"Save and print register"]
z(["End"])
c{"Arrived before start?"}
d["Mark present"]
e{"Within 10 minutes?"}
f["Mark late"]
h["Mark absent"]
i["Next student"]
s --> a
a --> b
b -->|no| g
g --> z
b -->|yes| c
c -->|yes| d
c -->|no| e
e -->|yes| f
e -->|no| h
d --> i
f --> i
h --> i
i --> b