Launch day run-of-show timeline

A launch-day run of show in 24-hour times so the order is clear, with each team's check in the event name.

The diagram

Final check meetingDeployGo liveUsage reviewRetrospective09:0010:0011:0013:0018:00
Timeline · 5 shapes

Reading it step by step

  • 09:00: Final check meeting
  • 10:00: Deploy
  • 11:00: Go live
  • 13:00: Usage review
  • 18:00: Retrospective

Gaps between events

  • From 'Final check meeting' to 'Deploy': 1 hour.
  • From 'Deploy' to 'Go live': 1 hour.
  • From 'Go live' to 'Usage review': 2 hours.
  • From 'Usage review' to 'Retrospective': 5 hours.
  • First to last: 9 hours in all.

Shape by shape

ShapeSymbolConnections
Final check meeting (09:00)Event-
Deploy (10:00)Event-
Go live (11:00)Event-
Usage review (13:00)Event-
Retrospective (18:00)Event-

Using this example

Use 24-hour times on a launch-day run of show so morning and evening are never confused. Note the metric to check at each time (errors, sign-ups) so the retrospective can fill in results. Adding a rollback deadline speeds up decisions if something breaks.

Symbols used here

SymbolMeaning
Time axisTime runs left to right (or top to bottom).
EventA dot for the moment, a box for what happened.

All timeline symbols and how to draw

Diagram text

Paste this text into the editor to get the same picture, then change the names to fit your own work.

# Launch day run-of-show timeline
timeline
  09:00 : Final check meeting
  10:00 : Deploy
  11:00 : Go live
  13:00 : Usage review
  18:00 : Retrospective

More timeline examples